Construction to close Broad River Rd. bridge at night - wistv.com - Columbia, South Carolina |

Construction to close Broad River Rd. bridge at night

Posted: Updated:
A photo from a recent bridge closing. A photo from a recent bridge closing.

Contractors working on the Broad River Road bridge will close the span for 10 hours each night for a week.

Rea Contracting will close the bridge from 8 p.m. to 6 a.m. nightly starting on July 18 through July 26.

The following detours will be posted:

Coming into Columbia on Broad River Road. Drivers will be detoured onto Greystone Blvd then onto I-126.

Coming from Columbia on Broad River Road. Drivers will be detoured to River Drive - to - North Main Street - to Elmwood and I-126.

Copyright 2012 WIS. All rights reserved.